Malton | |
---|---|
Malton station in December 1986 | |
Location | |
Place | Malton |
Local authority | Ryedale |
Grid reference | SE787713 |
Operations | |
Station code | MLT |
Managed by | First TransPennine Express |
Number of platforms | 1 |
Live arrivals/departures and station information from National Rail Enquiries |
|
Annual rail passenger usage | |
2004/05 * | 0.237 million |
2005/06 * | 0.252 million |
2006/07 * | 0.271 million |
2007/08 * | 0.282 million |
2008/09 * | 0.282 million |
2009/10 * | 0.291 million |
History | |
Opened 1845 | |
National Rail - UK railway stations | |
A B C D E F G H I J K L M N O P Q R S T U V W X Y Z | |
* Annual estimated passenger usage based on sales of tickets in stated financial year(s) which end or originate at Malton from Office of Rail Regulation statistics. Please note: methodology may vary year on year. | |
Malton railway station serves the towns of Malton and Norton-on-Derwent in North Yorkshire, England. It is currently operated by First TransPennine Express who provide all passenger train services.
Contents |
The typical Monday-Saturday off-peak service is:
On Sundays this is reduced to:
A half-hourly service, with timetable and fares integration with Yorkshire Coastliner buses, has been suggested as a means of providing relief to the parallel A64 trunk road that would be considerably cheaper than the option of dual carriageway (Campaign for Better Transport and Gazette & Herald letters)
At present, the station is only served by trains between Scarborough and York (and beyond), however prior to the Beeching Axe Malton station was also served by the Pickering Branch of the York and North Midland Railway with trains heading north (diverging at Rillington junction) to Pickering and then onwards to Grosmont and Whitby. This line closed entirely north of Pickering in 1965, with a freight-only service to Pickering surviving until 1966.
Though trains still run from Pickering to Grosmont as part of the preserved North York Moors Railway, the tracks between Rillington, where the line branched, and Pickering have since been lifted.
Up until 1958 the Malton & Driffield Railway, with trains heading south to Driffield, survived for freight and the occasional (summer-only) through excursion to the coast, after 1958 these excursion trains had to reverse at Scarborough Road junction on the easterly edge of Malton, back down towards Malton station before reversing again and heading off to Scarborough. Prior to 1950 there had been a passenger service nicknamed the 'Driffield Dodger' between Malton and Driffield.
As an interchange between three lines, Malton station would therefore have been considerably busier than it is now.
Though Malton station now only has one platform in use, at its peak there were two through platforms, plus an additional bay platform serving (mainly) Whitby local trains. The George Townsend Andrews overall roof was removed in 1989 and replaced by the canopy recovered from the Whitby platform.
One of Malton stations claim to fame was the novel solution adopted to allow passengers to access the second (island) platform, instead of a footbridge or barrow crossing the NER installed a removable section of platform, in the form of a wheeled trolley running on rails set at right-angles to the (single) running line. When a train required to use the platform the trolley was wheeled back under the up (York) platform; the trolley was interlocked with the signals giving access to the platform.
Until Northern Rail took over in 2004, Arriva Trains Northern did have services that stopped at Malton, the current York to Blackpool service used to continue to Scarborough alongside TransPenninexpress services. This service was usually worked by a Metro liveried Class 158 DMU, occasionally a Class 155 DMU. There was also a local service from York to Scarborough usually worked by a Pacer DMU or a Class 156.
There have been talks of reopening the old line between Rillington Junction and Pickering for some years - most notably in 2003[1] - but no attempt has come to fruition.
There is a petition on 10 Downing Street to reopen the line and upgrade the North Yorkshire Moors railway to cope with higher speeds (40 to 50 mph as opposed to 25 mph), to improve transport in the region, and to provide relief for the A64 more cheaply than dualling it in its entirety. The North Yorkshire Moors Railway eventually have plans to extend the line beyond Pickering to Malton, dependent on the level crossing at Pickering being re-instated.
Preceding station | National Rail | Following station | ||
---|---|---|---|---|
First TransPennine Express | ||||
Historical railways | ||||
Huttons Ambo Station closed; Line open |
Y&NMR York to Scarborough Line |
Rillington Station closed; Line open |
||
Disused railways | ||||
Terminus | Malton & Driffield Railway | Settrington | ||
Heritage railways | ||||
Terminus | North Yorkshire Moors Railway (Future Extension) |
Rillington |